Reports

Below are links to the documentation related to this project. Additional relevant documents will be made available for viewing on this website as they become available.

New Highway 7 – Phase 2 – Grand River Bridges – Design and Construction Report (2023)

Highway 7 New Transportation Environmental Study Report to Amend the Individual EA Study (2012)

Highway 7 New Kitchener to Guelph, 18 km – Initial Design Report (2014)

Highway 7 New and Highway 85 Interchange E-N Ramp Widening of the Highway 85 and Guelph Street Overpass – Design and Construction Report – (2015)

Highway 7 New: Victoria Street Widening and Bridge Replacement and Shirley Avenue Extension and Widening – Design and Construction Report – (2016)